3. The exhibits include the renderings developed by our architect and shown at the focus group meetings. The renderings include both functional and aspirational improvements.
VII.
Possible Solution - Gatehouse: While some may believe that the gatehouse's current understated design presents a quaint first impression, security concerns, and the building's obsolete infrastructure dictate the main reason to demolish the existing building and replace it with a new structure. A. Approximately 300,000 visits are recorded at the main gatehouse annually, consisting of members, guests, service providers, vendors, and staff. During these encounters, individuals denied entry by the security staff must currently enter the property to turn around, meaning we don’t truly have a gated community. B. The possible new gatehouse would be approximately 200 feet closer to Daniels Parkway. This would allow for the new gatehouse to be constructed while keeping the current gatehouse operational. The main gate is the only access for non-members, so it must stay fully operational during the construction phase (for vehicle logistics and surveillance/security). The existing gatehouse is inadequate for reuse and does not offer the needed port cohere. Reusing and remodeling the existing gatehouse was not deemed practical or necessary to achieve our future needs. C. The estimated cost of the gatehouse is $2.6 million—$3.1 million; as a reference point, the back gate, which does not have an associated building, cost $656,000 when installed in 2022. For a list of estimated costs, see FAQs for details. D. There is no Porte-cochere or rain protection for visitors who must provide proper identification, and the driveway is smaller than DOT standards. E. The existing road entrance area would be modified to alleviate the problem of contractor/visitor vehicles blocking the Member entrance lane during busy periods. F. The gatehouse houses the club's essential security equipment and controls. The existing building is not properly air-conditioned for the equipment and has weather-related issues.
G. The existing gatehouse would remain in place until the new gatehouse is constructed and fully functional. Keeping the main entrance operating during
18
Made with FlippingBook Ebook Creator